Alder

First production: 2016

Ithaca equity: 73.68%

Alder is a HPHT gas field tied-back to Britannia via an advanced 17-mile (28 km) subsea pipeline and a single producing well. The Alder field has been online since 2016.

Partners

Alder is operated by Ithaca Energy (UK) Limited (73.68%); Harbour Energy holds a 26.32% non-operated working interest in the field.

Close menu